About the project

Studio Four assisted Createability and Alliance Leisure to provide South Gloucestershire Council and the Circadian Trust with improvements at two leisure centres outside Bristol.

The first was Bradley Stoke Leisure Centre, where £3.6m of works included a new entrance lobby, re-cladding to the main front elevation, an extension to the existing gym, internal alterations to create additional fitness studios and café area, and re-planning the existing library. External works also included the formation of 146 additional parking spaces and new landscaping works, all within the existing site boundary.

Internally the creation of a children’s soft play zone and adjacent climbing walls was a huge success, and the facilities were officially opened by Paralympic gold medallist Andy Lewis in February 2017.

Other projects…

Haematology Dept, Southampton General

Although this project was initially part of the Oncology PFI, time pressures demanded that the Clinical Haematology Centre became a stand-alone project. Phase 1 consisted of 9 new Bone Marrow Transplant rooms where a whole floor was required to provide filtered air to each individual isolation room where patients may stay for up to six weeks.

New Forest Birthing Centre, Ashurst Hospital

Studio Four Architects Ltd were instructed to provide tender and construction drawings to enable Kier to build the new Birth Centre

Emergency Dept, Southampton General

Studio Four have been working with University Hospital Southampton NHS Foundation Trust to design the new Emergency Department at Southampton General Hospital.

East Wing Annexe, Southampton General

Phase 1a of East Wing Annexe is complete, comprising a floor of treatment and consulting rooms for the Cardiac Outpatients Department and Oncology Department

Haematology Day Unit, Southampton General

Completed in July 2013, the Haematology Day Unit at Southampton General Hospital will serve patients with leukaemia and other blood disorders

Teenage Young Adults, Southampton General

Completed on-site in July 2013 the state-of-the-art Teenage Young Adult Unit at Southampton General Hospital have now been opened

Medical Assessment Unit, Isle of Wight

Just opened on the 17th August, the new Medical Assessment Unit at St Mary’s Hospital

Day Surgery Unit, Southampton General

The Day Surgery Unit was completed in October 2012 and provides space for 38 patients who are attending Hospital for a surgical procedure that will be carried out that day and result in the patient being able to go home the same day.

Paediatric Theatres, Southampton General

Following on and adjacent to the completed H and J theatres, the Trust required a dedicated pair of theatres for Paediatrics, along with the support facilities and its own 5 bed recovery.

There is also an adjacent area currently proposed for a future Paediatric Day Unit.

The Kite Unit, Western Community Hospital. Southampton.

Studio Four worked closely with the Solent Estates Team to re-relocate a specialist neuropsychiatric rehabilitation facility.

The Gallery

Romsey

Tollgate Estates
Stanbridge Earls
Romsey
Hampshire
SO51 0HE

01794 511 255

Winchester

Sherwood House
8 Upper High Street
Winchester
Hampshire
SO23 8UT

01962 820 255

Southampton

1-3 Lyon Street,
Southampton
Hampshire
SO14 0LD

023 8022 8923

   CIAT Logo