About the project

Following on and adjacent to the completed H and J theatres, the Trust required a dedicated pair of theatres for Paediatrics, along with the support facilities and its own 5 bed recovery.

There is also an adjacent area currently proposed for a future Paediatric Day Unit.

Other projects…

Biomedical Research Unit, Southampton General

Categories: Acute Healthcare | Primary Healthcare | Education | Community | Private...

Medical Assessment Unit, Isle of Wight

Just opened on the 17th August, the new Medical Assessment Unit at St Mary’s Hospital

Adult Cardiac Unit, Southampton General Hospital

The first Young Adult Cardiac unit in the country, to provide care for patients with congenital heart problems

Endoscopy, Isle of Wight

Designed and procured under P21+, the totally new

Neonatal Ward, Princess Anne Hospital

The internal refurbishment scheme at Southampton’s maternity hospital was designed to provide extra cot spaces within the existing Neonatal department.

The new cot bays exist in a larger area allowing more space for the nursing staff when treating a single patient.

Paediatric Theatres, Southampton General

Following on and adjacent to the completed H and J theatres, the Trust required a dedicated pair of theatres for Paediatrics, along with the support facilities and its own 5 bed recovery.

There is also an adjacent area currently proposed for a future Paediatric Day Unit.

Helipad, Southampton General

Studio Four designed a helipad capable of accommodating the largest helicopters used in civilian rescue.

Private Patients Ward, Basingstoke

The Hampshire Hospitals NHS Foundation Trust intends creating a regional centre of excellence for the treatment of bowel cancer at Basingstoke Hospital.

WISH Laboratory, Southampton General

Studio Four were appointed to design this laboratory fit-out project situated on Level F of the Biomedical Research Unit (BRU) at Southampton General Hospital.

Diagnostic Treatment Centre, Winchester

The project consisted of a new 4-storey extension to the existing hospital and included DTC services, a Day Theatre Unit, an Oscopy Unit, a Cancer Care Unit, Short-Stay and Standard Wards.

The first phase included all the structural elements of the building together with the internal fit-out of the top floor and plantrooms.

The Gallery

Romsey

Tollgate Estates
Stanbridge Earls
Romsey
Hampshire
SO51 0HE

01794 511 255

Winchester

Sherwood House
8 Upper High Street
Winchester
Hampshire
SO23 8UT

01962 820 255

Southampton

1-3 Lyon Street,
Southampton
Hampshire
SO14 0LD

023 8022 8923