About the project

Planning was granted in late 2020 for the refurbishment, reconfiguration and multiple extensions to an existing house in Hampshire. Works include the removal of an existing attached garage, creation of a 2 storey side extension to create a new front entrance to the house, as well as provide 3 additional bedrooms upstairs, and a guest bedroom downstairs. The new ground floor area also provides a boot room, home office and gym. The existing house is reconfigured to provide a larger kitchen / dining space and a larger lounge with better access to the garden. A new 2 bay garage is created off the new driveway

Other projects…

Private House, Reading

Studio Four have designed an extension to a large property near Reading.

Foxhayes, Chilworth

Categories: Acute Healthcare | Primary Healthcare | Education | Community | Private...

Waterfront House, Netley

Categories: Acute Healthcare | Primary Healthcare | Education | Community | Private...

Whitedale Farm

In August 2021 we submitted a planning application for the conversion of a modern agricultural...

New Build House, Hamble

Our Southampton office designed an award winning house inspired by Frank Lloyd Wright and finished with hand make brick and oak panelling.

Step Terrace

Rear extensions to 2 terraced house which involved the demolition of low quality extensions, replacement with modern full width extensions
Status: Completed 2017

West View

This project involved the reconfiguration and extension of an existing bungalow, as well as the creation of a second floor by raising the roof.
Status: Completed 2019

Watch House, Lepe

Categories: Acute Healthcare | Primary Healthcare | Education | Community | Private...

Sheep Dip

Conversion and connection of 2 existing outbuildings. Other works include a new orangery and manipulation of the existing roof to create a larger master bedroom.
Status: Technical Design

Green Orchard

Complete refurbishment of an existing dwelling, including raising of the roof to create an additional floor space and creation of an indoor swimming pool.
Status: Start on Site March 22

The Gallery