About the project

A new build 3-storey block adjacent to the main hospital providing a new HSDU department on the floor plus additional floor accommodation for a future fit-out.

Plant facilities are provided on the 2nd floor fit-out facilitating the whole building independently.

Other projects…

Haematology Day Unit, Southampton General

Completed in July 2013, the Haematology Day Unit at Southampton General Hospital will serve patients with leukaemia and other blood disorders

Adult Cardiac Unit, Southampton General Hospital

The first Young Adult Cardiac unit in the country, to provide care for patients with congenital heart problems

Haematology Dept, Southampton General

Although this project was initially part of the Oncology PFI, time pressures demanded that the Clinical Haematology Centre became a stand-alone project. Phase 1 consisted of 9 new Bone Marrow Transplant rooms where a whole floor was required to provide filtered air to each individual isolation room where patients may stay for up to six weeks.

New Forest Birthing Centre, Ashurst Hospital

Studio Four Architects Ltd were instructed to provide tender and construction drawings to enable Kier to build the new Birth Centre

Private Patients Ward, Basingstoke

The Hampshire Hospitals NHS Foundation Trust intends creating a regional centre of excellence for the treatment of bowel cancer at Basingstoke Hospital.

Medical Assessment Unit, Isle of Wight

Just opened on the 17th August, the new Medical Assessment Unit at St Mary’s Hospital

Paediatric Theatres, Southampton General

Following on and adjacent to the completed H and J theatres, the Trust required a dedicated pair of theatres for Paediatrics, along with the support facilities and its own 5 bed recovery.

There is also an adjacent area currently proposed for a future Paediatric Day Unit.

Diagnostic Treatment Centre, Winchester

The project consisted of a new 4-storey extension to the existing hospital and included DTC services, a Day Theatre Unit, an Oscopy Unit, a Cancer Care Unit, Short-Stay and Standard Wards.

The first phase included all the structural elements of the building together with the internal fit-out of the top floor and plantrooms.

Sterile Supplies Department, Isle of Wight

A new build 3-storey block adjacent to the main hospital providing a new HSDU department on the floor plus additional floor accommodation for a future fit-out.

Day Surgery Unit, Southampton General

The Day Surgery Unit was completed in October 2012 and provides space for 38 patients who are attending Hospital for a surgical procedure that will be carried out that day and result in the patient being able to go home the same day.

The Gallery

Romsey

Tollgate Estates
Stanbridge Earls
Romsey
Hampshire
SO51 0HE

01794 511 255

Winchester

Sherwood House
8 Upper High Street
Winchester
Hampshire
SO23 8UT

01962 820 255

Southampton

1-3 Lyon Street,
Southampton
Hampshire
SO14 0LD

023 8022 8923

   CIAT Logo