As we approach the end of the year, a few of our private dwelling schemes are developing well on site.

At Glebe cottage our extensive refurbishment and multiple extensions are nearing completion on site. After 8 months on site the project will shortly be handed over to the client who will complete the remaining finishes and fixings outside of the contract. The scheme involved the creation of a 2 storey side extension connecting the existing house to the garage, a 2 storey extension to the rear to provide larger bedrooms upstairs and an open plan dining and kitchen space with pocket door opening up to the private garden behind. At the front we created a single storey, pitched roof, oak frame extension to create a larger living space and maximise on views to Winchester Hill and beyond. What once was a rather ‘ugly duckling’ within a beautiful village has been transformed into a contemporary yet inviting dwelling. For more project information click here 

 

 

Our contemporary new build dwelling near Winchester has progressed well on site this year, thanks to a pre-fabricated timber frame which was constructed off site and assembled in 2 weeks on site. Currently the contractor is on first fix plumbing and electrical installation, with completion set for the end of March next year. This house is anything but standard though, with external pocket doors, a  feature window seat, a surround sound system and oak trusses to give this house the real wow factor. This project will also benefit from the installation of an air source heat pump (ASHP), Mechanical, Ventilation, Heat Recovery (MVHR) and a 3 phase electrical system. For more project information click here